Quote for Part DD101 LONG LEAD by Crl Components Inc - NSN 5910-00-678-8157 Part
-
Part Number: DD101 LONG LEAD
-
Alternate P/N: DD101LONGLEAD
-
Manufacturer: Crl Components Inc
-
NSN: 5910-00-678-8157 (5910006788157)
-
NIIN: 006788157
-
Item Name : Capacitor Fixed Cer
-
CAGE Code: 71590
-
FSC: 5910 Capacitors
Part number DD101 LONG LEAD , Capacitor Fixed Cer by Crl Components Inc with NSN 5910006788157 is now available in our ready-to-ship inventory. Are you interested in a quick quote for the part number DD101 LONG LEAD? If so, just fill out the Request for Quote (RFQ) form above and click submit.
We have one of the fastest RFQ response times in the industry at only 15 minutes, simply complete the form to get started.
Upload RFQ Sheet
If you have more than one item, upload your spreadsheet here
NSN Information for Part Number DD101 LONG LEAD with NSN 5910-00-678-8157, 5910006788157
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-678-8157 Item Description: Capacitor Fixed Cer | 5910 | 006788157 | 0 | P | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
Dd101 Long Lead | 1 | 1 | C | A |
Characteristics Data of NSN 5910-00-678-8157, 5910006788157
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES, RADIAL TERMINALS |
AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MISSILE, AI-TO-AIR, PHOEB=NIX (AIM-54); TELETYPE, MODEL 28; TEST CONSOLES, MINI-SACE; ENGINE, AIRCRAFT TF33-PW-102 (C-135E, EC-135H/K/P); MISSILE, AIR-TO-AIR, SPARROW (AIM-7); SUPPORT EQUIPMENT, MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT, B- |
CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0/+22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
We are proud to supply every branch of the United States military
Top National Stock Numbers
5306013334523 |
7490013953355 |
6140014469498 |
7025015900737 |
3130015369045 |
4730009541281 |
6240001557836 |
5965016488042 |
5330012852788 |
7210000527327 |